Showing Layers

Layers are showing. Concrete, terrazzo, wood, blocks, bricks, and steel. A stroll around the inside of the building right now shows the foundations that everything we will touch and see in the new space will be built on. 


The last parts of the floor have been cut and broken up and the new floor will be poured and smoothed in the next few days.

The knee wall where the windows will rest has been completed. The aluminum framing on top of it will hold the butt joint glazed windows–where two panes come together at a corner without a pane. Floor to ceiling windows will run up to the end of the knee wall and expand across the rest of the front and side of the space allowing a lot of natural light into the space throughout the day.