Brick Work Begins
The brick work has begun. It’s subtle but as they move down the building you can see the painted brick give way to restored masonry reminiscent of the building’s original look.
Check it out in person if you’re passing through. It is temporarily visible as the repairs are being made before the building’s facade work gets underway.
In the Spring a large-scale public art piece will be installed, wrapping the building with a high-quality, brightly colored mural. It is being developed by local artists to complement the building’s design and wrought ironwork designed and installed by southwest Detroit’s own Diseños.