Some Windows Installed
Today the Avis side of the building was opened up and the retractable glass wall panels were installed. Also the doors on Elsmere are now in place and operational.
Tomorrow the frames for the windows around the rest of the building will be here.
With the plywood off and the glass up we are starting to get an idea of how open the space will feel on the Avis side. Looking forward to time spent on the porch with neighbors in the near future.